Electricity Meter Installation and Replacement

An electricity meter wears out, becomes outdated, or reaches the end of its calibration interval over time — at that point it needs replacing. The electrician removes the old unit, installs and wires in a new one in the panel or on a meter board, and any approval or sealing with the utility company can be handled as a separate step.

An outdoor meter panel being connected — photo from a job

What's included

  • Inspecting the current meter and panel, and confirming a suitable model
  • Removing the old electricity meter
  • Installing and wiring in a new meter in the existing panel or at a new location
  • Checking correct phase connection and testing the meter under load
  • Advice on accuracy class and meter type (single-phase/three-phase)
  • Explaining that coordinating and sealing the meter with the utility company is a separate step, which you can handle yourself or check with the electrician about

When you need this

  • The meter's calibration interval has expired
  • The meter is visibly damaged, the housing is cracked, or the glass is broken
  • The meter shows clearly incorrect readings or has stopped counting
  • An old induction meter is being replaced with a modern electronic one
  • A panel replacement or assembly is planned, and the meter needs updating at the same time
  • The meter needs to be relocated — for example, when the panel is being moved

How the work is done

Inspecting the current meter, panel, and incoming cable
Selecting a meter to match the supply type (single-phase or three-phase) and load
Removing the old unit and installing the new one, connecting it to the line
Testing the meter's operation under load

Pricing

ServicePrice
Electricity meter replacement/installation (unit)from 7,000 KZT

Coordinating and sealing the meter with the utility company, if required, is billed and arranged separately. The final installation cost depends on the meter type and connection complexity.

An electricity meter has a limited service life: it has a calibration interval, after which its readings are officially considered invalid even if the meter is physically working fine. Meters also become outdated over time — older induction models are gradually being replaced with electronic ones, which measure load more accurately and need servicing less often.

When replacing a meter, it matters not just that it's wired in correctly, but that the right type is chosen — a single-phase meter suits most apartments, while three-phase meters are more common in private houses and anywhere the load is higher.

Once a new meter is installed, it typically needs to be registered and sealed by the utility company — this step isn't part of the installation itself and is handled separately; the exact process and requirements are confirmed on site, since they can vary by case.

Completed installation work carries a warranty of up to 3 years.

Frequently asked questions

How much does it cost to replace an electricity meter?

Replacing or installing an electricity meter is from 7,000 KZT per unit. The final price depends on the meter type (single-phase or three-phase) and connection complexity. Coordinating and sealing with the utility company, if needed, is a separate step.

Does the meter replacement need to be coordinated with the power utility?

In most cases, after a meter is replaced it needs to be sealed and registered with the utility company — this is a separate procedure that you can handle yourself, or check the details with the electrician when booking the service.

How do I know it's time to replace the meter?

The main signs are an expired calibration interval, a damaged housing, or clearly incorrect or zero readings. If you're unsure, the electrician can assess the meter's condition during the visit.

Can the meter be replaced without cutting power to the whole building?

In an apartment with its own supply, a short power cut during the replacement is usually enough. In buildings with a shared supply, timing is agreed in advance.

Which meter should I choose — single-phase or three-phase?

This depends on the type of supply to the apartment, house, or office and the total load. The electrician can advise on the right option when inspecting the panel.

Can an electrician be called at night to replace a meter?

Yes, we work 24/7 — but night and emergency call-outs are billed at a higher rate (from 6,000 KZT), separately from the cost of the meter replacement itself.

Need an electrician?

Call or message us on WhatsApp — we'll discuss the job and advise on next steps.

Call WhatsApp
ELECTRIC ASTANA